COMMERCIAL

Tenant Improvement Plans across Florida

Plans for commercial fit-outs, including offices and retail spaces.

What the work involves

A tenant fit-out begins with the space you are leasing and the operation you want to put in it. The drawings identify what stays, what changes and how the new layout connects to the building's systems. Reviewing the lease, landlord criteria and existing approvals early helps define the scope.

The scope may include

  • Demolition plan for the existing build-out
  • Proposed floor plan showing the leased area
  • Reflected ceiling plan and lighting layout
  • Partition types and rated assembly details
  • Door, frame and hardware schedule
  • Accessibility layout for restrooms and the route
  • Life safety plan with exits and travel distance
  • Finish plan and interior elevations
  • Equipment and millwork plan

The final documents and any separate engineering work are confirmed with the practice before work starts.

Check the space before committing

Share the proposed operation, lease information, landlord criteria and any existing approved drawings. The fit-out needs to work with the shell, available services and building access. Information supplied by a previous tenant is worth checking before it becomes the basis of a new layout.

If the operation differs from the approved use, discuss a feasibility or change-of-use review before treating the project as a straightforward interior fit-out. Specialist restaurant and clinical requirements should be identified at the same stage.

Office fit-outs

Start with headcount, meeting needs, privacy, storage and expected growth. A team that mainly uses open work areas has a different brief from one that needs enclosed rooms or client meetings. Share furniture and equipment information so the layout reflects the space you will actually use.

New rooms and partitions need to be coordinated with access routes, lighting, ventilation and the existing building services. Confirm the landlord review and identify which trade or specialist drawings accompany the architectural set.

Retail fit-outs

Describe the products, displays, customer movement, checkout and stock storage. Equipment and fixture sizes help the architect establish a usable layout, rather than drawing around an assumed shop arrangement.

Storefront, signage and exterior proposals may involve landlord or local design review as well as the interior work. Identify those items in the brief and agree who provides their details. A shop becoming a restaurant or another materially different operation needs its use and building requirements investigated separately.

Common project situations

Examples of where this service can help:

  • Office suite built out in a multi-tenant building
  • Retail tenant space fitted with a stockroom
  • Salon with styling stations and a shampoo area
  • Dental suite with treatment rooms
  • Gym with a studio and locker rooms
  • Professional office expanded into an adjacent suite

Planning the scope

These points help define the work before drawings or reports are prepared.

Existing conditions to discuss
  • Unfinished leased space with existing utility connections
  • Existing ceiling grid and diffusers to reuse or move
  • An old build-out whose partitions do not match the base drawings
  • Sprinkler heads that have to move with the new ceiling
  • A storefront that stays exactly as it is
Coordination with other specialists
  • Mechanical distribution above the new ceiling
  • Electrical panels, circuits and lighting controls
  • Plumbing for restrooms and break areas
  • Fire sprinkler relocation and alarm devices
  • Data and low voltage cabling
  • Landlord review and base building tie-ins
  • Millwork and casework fabrication
Issues that may affect review
  • The landlord's work letter disagreeing with the actual shell condition
  • Sprinkler heads not moved to match the new ceiling
  • A restroom count or accessibility layout that falls short
  • Exits serving the suite through another tenant's space
  • The occupant load rising above what the shell was designed for
  • A request for a temporary certificate of occupancy
Work to discuss separately
  • Core and shell work by the base building team
  • Landlord base building work
  • Commercial kitchen design and equipment
  • Engineering of base building structures
  • Furniture and equipment procurement

FLORIDA PERMIT DATA

What the permit records show

Data through August 2026

Matching permits
4,023
Median declared job value
$97,000
Middle 50% of declared values
$24k–$300k
Permits with a declared value
3,700

"tenant improvement" appears in 4,023 matching permits in the Florida records we analyzed. Declared job value is the value shown on the permit application, not a contract price, and it is based on 3,700 matching permits with a declared value.
How we count.

How the work progresses

Typical steps are outlined below. The practice confirms the scope and who handles each stage.

  1. Review the operation and existing space. Check the available drawings, landlord criteria and information needed to assess the proposed fit-out.
  2. Develop the layout. Review room or fixture arrangements, access and equipment with the owner and landlord before detailed coordination.
  3. Coordinate the drawing package. Establish the responsibilities for architectural, structural and building-system information needed for the scope.
  4. Issue and follow up within the appointment. Confirm landlord approval, permit submission, review responses and any later construction questions.

Questions about this service

Do I need a permit to build out a leased space?

Building and trade changes commonly require permits. Landlord approval serves a different purpose and does not replace them. Confirm the local application requirements and the approvals needed to occupy the finished space.

Who pulls the permit for a tenant improvement?

Confirm the applicant and filing responsibilities with the landlord, tenant and contractor. The lease may allocate responsibilities, while the building department sets its own application requirements.

Can I open before the certificate of occupancy is issued?

Use the space only under the occupancy authorization required by the building department. A temporary authorization may be available in some circumstances, but it must be granted before use; do not assume it will be issued.

What drawings does a landlord require before approving a build-out?

Start with the landlord's work letter or design criteria. The package may include floor and ceiling plans, service changes, finishes and details of connections to the existing building. Agree the landlord-review requirements alongside the permit scope.

What happens after I send a request?

We pass your project details to a Florida architecture practice. Discuss the scope, fees and schedule directly with the practice before deciding to proceed.

Related services

Restaurant Architect

Restaurant layouts and coordinated permit drawings for dining, kitchens and building services.

Commercial Architect

Design and coordinated documentation for new commercial buildings and changes to existing spaces.