Permit Plans
Permit drawings and sealed documents, with the scope and responsible designers agreed for your project.
SITE & EXISTING CONDITIONS
Drawings showing proposed improvements in relation to the property and site constraints.
A site plan helps establish where proposed work can go on the property. Boundary information, setbacks, easements and existing improvements form the starting point. Drainage, parking, trees and flood requirements may add to the scope and require coordination with a surveyor or other specialists.
The final documents and any separate engineering work are confirmed with the practice before work starts.
A boundary survey provides information about the property; the site plan uses the relevant information to show proposed work and its relationships. Share the survey, easements, existing improvements and any known site records before the layout is prepared.
Ask whether the survey is sufficient for the proposed work or whether updated field or elevation information is needed. A site-plan drawing does not establish unknown boundaries or replace surveying.
Parking, access, drainage, trees, utilities and flood information can affect where the work can be placed. Identify which items need architectural coordination and which require a surveyor, civil designer or another specialist.
Agree whether the appointment covers a basic layout, supporting permit information or a more extensive coordinated package. The site information and responsible disciplines should be established before a drawing is treated as complete.
Examples of where this service can help:
These points help define the work before drawings or reports are prepared.
FLORIDA PERMIT DATA
Data through August 2026
"drainage" appears in 12,998 matching permits in the Florida records we analyzed. Declared job value is the value shown on the permit application, not a contract price, and it is based on 10,480 matching permits with a declared value.
How we count.
Typical steps are outlined below. The practice confirms the scope and who handles each stage.
The terms can overlap, particularly for residential applications. A plot plan often shows the building and improvements on the lot, while a more detailed site plan can include parking, drainage, landscaping and utilities. Use the reviewing authority's checklist to establish the required information.
A current survey is commonly needed to establish reliable boundaries, dimensions, easements and relevant elevations. The exact requirements vary by application. Property-appraiser maps and owner sketches should not be assumed to provide the accuracy or information needed for permit review.
The calculation identifies surfaces counted as impervious under local rules, such as roofs, paved driveways and patios. Rules for pools, gravel and other surfaces can vary. Confirm the definition, permitted coverage and required calculation for the property.
A pool application commonly needs a site plan showing the location, setbacks, deck, barriers and equipment. Drainage and easements can also affect the layout. Confirm the required information with the building department before finalizing the pool position.
We pass your project details to a Florida architecture practice. Discuss the scope, fees and schedule directly with the practice before deciding to proceed.
Permit drawings and sealed documents, with the scope and responsible designers agreed for your project.
Design for a new home, from the first layout to coordinated permit drawings.
Design and permit drawings for duplexes, townhouses and small apartment buildings.
Measured drawings documenting a building's existing layout and visible conditions.