Plan Review Response for Florida projects

Drawing revisions and written responses to building-department review comments.

What the work involves

A correction notice can ask for a clearer detail, supporting information or a change to the design. The practice reviews each comment against the submitted documents and prepares the response within its scope. Structural or other specialist comments may need input from the responsible designer.

The scope may include

  • Comment matrix pairing each comment with its answer
  • Revised sheets with revision clouds
  • Code section citations for each answer
  • Revision description and updated drawing index
  • Response letter addressed to the reviewer
  • Supplemental details where a comment asked for more

The final documents and any separate engineering work are confirmed with the practice before work starts.

Start with the complete correction notice

Send the written comments, the set that was reviewed and any previous responses. The practice needs to understand what the reviewer is asking and which submitted document it concerns. A summary of a comment can miss a reference or requested item that affects the response.

Each comment can then be assigned to the responsible designer. Some need a clearer note or supporting record; others may require a design change or specialist input. Agree the response scope with the people responsible for the original documents.

Keep the response and revisions consistent

A useful response identifies the comment, explains the action taken and points to the revised sheet or supporting document. Changes should be coordinated across the set rather than made only on the page named in the notice.

If a comment is unclear or disputed, seek clarification through the appropriate review process. Resubmitting unchanged drawings without explaining the issue gives the reviewer little new information.

Common project situations

Examples of where this service can help:

  • Held residential permit with a correction notice
  • Commercial build-out returned for egress comments
  • Roof permit held over product approval
  • Window submittal returned for design pressure
  • Demolition permit held for a utility disconnect letter
  • Addition returned for a missing truss letter

Planning the scope

These points help define the work before drawings or reports are prepared.

Existing conditions to discuss
  • A set already submitted and marked up by the reviewer
  • Drawings prepared elsewhere and no longer available in editable form
  • Scope that changed after the first submittal
  • A property with earlier permits still open
  • File documentation that does not match the drawings
Coordination with other specialists
  • The contractor who filed the application
  • The original designer when the drawings came from elsewhere
  • The product supplier for approval documentation
  • The engineer of record for structural comments
  • The reviewer, for clarification of an ambiguous comment
Issues that may affect review
  • A comment questioning the occupancy classification
  • Egress or accessibility items not addressed in the original set
  • Structural members added without calculations
  • A scope change made after the first review
  • Documents referenced in the set but never submitted
Work to discuss separately
  • Preparing a first submittal for a project never reviewed
  • Appealing a building official's decision
  • Engineering calculations for structural comments
  • Contractor qualification questions
  • Construction work needed to clear an inspection

How the work progresses

Typical steps are outlined below. The practice confirms the scope and who handles each stage.

  1. Collect the notice and reviewed documents. Confirm which comments fall within the practice’s appointment.
  2. Assign comments and agree the required action. Identify specialist responses and any missing supporting information.
  3. Prepare coordinated revisions and a response record. Check that changes are reflected across the affected documents.
  4. Issue the response for resubmission. Confirm who files it and how any further comments will be handled.

Questions about this service

Can I just resubmit the same drawings?

Some comments can be answered with clarification or a supporting document. Others require revised drawings. Address each comment directly and identify the relevant sheet or attachment so the reviewer can find the answer.

What does a correction notice actually require?

It lists the items the reviewer wants clarified or corrected. The response should follow the same numbering and explain the answer to each item, with revised sheets or supporting documents where needed.

Who should respond to the comments?

Start with the practice and specialists responsible for the submitted design. If the original designer is unavailable, another practice must first review the documents and confirm what responsibility it can take for the response.

What if I disagree with a comment?

Ask for clarification and discuss the code basis with the responsible design professional. If the issue remains unresolved, the building department can explain its interpretation and any formal review or appeal process.

What happens after I send a request?

We pass your project details to a Florida architecture practice. Discuss the scope, fees and schedule directly with the practice before deciding to proceed.

Related services

Permit Plans

Permit drawings and sealed documents, with the scope and responsible designers agreed for your project.

Tell us about your project

Share the location and what you have in mind. A practice can review the scope and quote the work you need.

Request a quote